How to prepare your home before a remodel starts

Protect belongings, set up the house for dust, water and power changes, and plan access for the crew, with a practical prep checklist to finish before demolition begins.

A woman and two children carry a cardboard box together in a room that is being prepared for renovation, with furniture covered in plastic sheets.

Preparation is the difference between a remodel that disrupts the household for a few weeks and one that disrupts it for months. Demolition creates dust and debris, trades need access to every room they work in and the systems you depend on, such as water, power and heating, may be interrupted. A house that has been prepared well keeps belongings safe, limits the spread of dust and lets the crew work efficiently. A house that has not been prepared often ends up with damaged furniture, dust in every room and a frustrated crew.

Preparation also protects the work itself. Clearing the space lets the crew see the walls, floors and fixtures they need to address, and it reduces the risk of accidental damage to items that should be kept. Spend the time before demolition begins, rather than trying to solve these problems as they come up.

Move or protect belongings

Clear the rooms being remodeled as completely as possible. Move furniture, rugs, electronics, artwork and small appliances to a room that will not be used for work, or to a storage unit if the home lacks space. Remove items from the walls and the shelves, and pack breakable items in labeled boxes. Keep a list of what is stored where, so you can find things quickly after the work ends.

Protect the rooms next to the work area. Cover furniture and built-in shelves with plastic or drop cloths, and close the doors to rooms that will be kept clean. Remove valuable items from walls near the work, and take photos of the condition of the house before the work begins. Those photos can be useful if a dispute about damage ever arises.

Set up for dust and debris

Dust is one of the most persistent problems in a remodel. If the home was built before 1978, federal EPA rules require contractors who disturb painted surfaces to be lead-safe certified and to follow lead-safe work practices. Older homes may also contain asbestos in flooring, insulation or textured ceilings, so ask whether materials will be tested before demolition. Ask your contractor to build plastic dust barriers around the work area, with a zipper door or a flap for access. Cover the HVAC return vents in the work area, and turn off the system or keep it running with the vents closed, depending on your contractor's advice. Use a fan with a window to exhaust air outside when appropriate.

Plan for debris removal. Ask whether the contractor provides a dumpster, where it will be placed and how the crew will move debris from the house to the container. Clear the path to the work area and any exterior spaces that the dumpster or the crew will use. Keep vehicles clear of the driveway as needed.

Plan for utilities and access

Find out when the water and power will be interrupted. Many remodels require the water to be shut off for part of the day, and some require the electrical service to be turned off for specific circuits. Ask the contractor for the schedule in writing, and plan to store food, prepare drinking water and arrange alternative bathroom access during those periods.

Give the crew clear access. Decide where they can park, where they can store tools and materials and which entrance they will use. Mark any areas that are off limits, such as a home office or a nursery. Provide keys or codes if the crew must enter when no one is home, and agree on a process for those visits.

Prepare the household

Talk with everyone in the home about the schedule and the rules. Explain which rooms will be off limits, when the noise will be loudest and how the temporary arrangements will work. Children and pets need extra attention, because construction areas can be dangerous. Keep pets in a quiet room away from the work, and keep children out of the work zone at all times.

Set up a temporary space for daily life, including a place to store clothing, a place to eat and a way to get through the day without the affected room. Plan for the work to take longer than expected, and build flexibility into the household routine.

Prep checklist

  • Move or cover furniture, rugs, electronics and valuables.
  • Photograph the house before the work begins.
  • Confirm dust barriers, HVAC handling and debris removal with the contractor.
  • Get the water and power shutdown schedule in writing.
  • Arrange parking, tool storage and crew access.
  • Set up temporary cooking, bathroom and storage arrangements.
  • Brief the household and secure pets and children away from the work.

Before demolition

Walk through the house with your contractor before demolition begins, and agree on the protection plan, the access plan and the utility schedule. Complete the checklist in the week before the work starts. Be sure to schedule a final walkthrough with the crew on the day before demolition, so the rooms are cleared and the protection is in place.