What a remodeling contract should include
Learn which terms a remodeling contract should spell out, including scope, schedule, payments, change orders, permits, insurance, warranties and dispute resolution.
A remodeling contract is the document that defines what will be built, how much it will cost, when it will be finished and who is responsible for each part of the work. Many remodeling disputes trace back to terms that were discussed but never written down, or written so vaguely that each side read them differently. A complete contract does not guarantee a smooth project, but it gives you a shared reference when questions come up, and it protects both parties from misunderstandings.
Before you sign, read the contract in full and ask questions about anything you do not understand. Confirm that the contract matches the bid you accepted and any changes agreed to since. A signed contract is binding, so the time to fix an error is before the signature, not after the first payment.
Scope and specifications
The contract should describe the work in enough detail that two reasonable people would agree on what is included. Attach the scope document, the drawings, the product specifications and any plans that define the project, and refer to them in the contract. List the rooms, the demolition, the layout changes, the fixtures, the finishes and the appliances the contractor will install. State which items the homeowner is providing and which the contractor is responsible for.
Identify what is excluded as well. A clear list of exclusions prevents disputes about work that was never included in the price. Common exclusions include furniture moving, painting if it was not in the bid, appliance purchases and repairs to hidden damage that is discovered later.
Schedule and completion
The contract should state the start date, the expected completion date and the key milestones in the project. Include the process for handling delays, such as weather, late deliveries or inspection failures, and state how the schedule will be updated in writing. Some contracts include liquidated damages, which are fixed amounts payable for delays, and those terms should be reviewed carefully.
Ask for the contract to state what happens if the work is not complete on the agreed date. A clear process protects both parties and helps avoid arguments about whether the delay is excusable.
Payments and deposits
The payment section should show the total price, the deposit, the progress payments and the final payment. Tie each payment to a specific milestone, such as the completion of rough-in or the delivery of cabinets, rather than to a calendar date. State whether any payment is made by check, card or bank transfer, and avoid cash.
Check the state rules on deposits. Some states limit the amount a contractor can request before work begins, and some require specific language in the contract. Ask the contractor to confirm that the contract complies with those rules.
Change orders
The contract should describe how changes are requested, priced and approved. Every change should be written as a change order that describes the work, the cost, the effect on the schedule and the signatures of both parties. State that work will not proceed on a change until the change order is signed, except in urgent cases where the contract provides a specific process for safety issues.
Permits, inspections and insurance
Confirm which party will obtain the permits and schedule the inspections. Ask whether the contract makes the contractor responsible for the cost of failed inspections caused by its own work, since that clause can prevent later disagreements about who pays for a reinspection. Include a statement that the contractor will maintain the required licenses and insurance throughout the project, and attach copies of the certificates. Ask for a clause requiring the contractor to provide updated certificates if coverage changes.
Warranties, dispute resolution and termination
The warranty section should describe the workmanship warranty, its duration and what it covers. Include the manufacturers' warranties and who handles them. State how the parties will resolve disputes, such as through mediation or arbitration, and whether the contract includes a clause about attorney fees. Explain the process for terminating the contract and the payments due if either party ends it early.
The FTC's Cooling-Off Rule generally gives you three business days to cancel a contract signed in your home with a seller who came to you, and a loan secured by your home can carry its own right to cancel. Many states add their own rules for home improvement contracts. Ask your state attorney general or consumer protection office which apply, and make sure the contract states any right to cancel clearly.
Checklist before you sign
Check that the contract includes each of these items:
- Parties, the contractor's license number and the business address
- Scope, with attached drawings and specifications
- Allowances and exclusions
- Start and completion dates
- Total price and the milestone payment schedule
- The change order process
- Permits and inspections
- Insurance certificates
- Lien waivers with each payment
- Workmanship warranty
- Cleanup and debris removal
- Dispute resolution and termination terms
- The cancellation notice
Read the full contract with the contractor's written bid and scope side by side, and confirm that every item matches. Ask a lawyer or a local consumer protection office to review the contract if the project is large or the terms are unclear. Plan to request revisions in writing for any term that does not match your understanding, and sign only after the final version reflects the agreed work.