How to plan a bathroom remodel

Work through the decisions for a bathroom remodel in the right order, from use and budget to layout, ventilation, waterproofing, permits and the contractor schedule.

A man and a woman in a room undergoing construction, looking at blueprints and pointing at the unfinished wall.

A bathroom is one of the most technically demanding rooms in a house. It combines water supply, drainage, ventilation, electrical circuits, waterproofing and fixtures that must line up with the framing. A bathroom remodel that looks simple on a showroom display can hide a lot of work behind the walls, and the decisions made early in the plan determine how much of that work you pay for. Planning in a clear order helps you avoid the common result of a beautiful room with a poor fan, a shower that leaks or a tub that sits where the drain cannot reach.

Start with how the room is used rather than with tile or fixtures. A household with two adults who share a morning routine has different needs from a family with young children or a guest bath that is used once a week. Once you know the daily pattern, the layout, fixtures and finishes follow more easily.

Decide how the room is used

List who uses the bathroom and when. Note whether anyone needs a bathtub, a walk-in shower, a seat in the shower or extra counter space for grooming. Decide whether the room needs a separate toilet compartment or a double vanity, and whether privacy from the hall or other rooms matters. These answers set the most important constraints on the plan.

Set your budget next, and separate the work that must happen from the work you would like. Waterproofing, ventilation and electrical updates are usually part of a full remodel, and moving plumbing adds more; these behind-the-wall items cost more than the visible finishes. Keeping those items in the budget first protects the parts of the room that are hard to fix later.

Map the layout and the plumbing

Measure the room, and mark the location of the existing toilet, sink, tub or shower, the supply lines and the drain. Moving a drain or a supply line adds cost, and some moves are limited by the floor joists, the slab or the location of the main stack. If you want the toilet or shower in a different place, ask your plumber to confirm whether the change is practical before you draw the layout.

Plan clearances in the layout. Leave room in front of the toilet and sink, and check the door swing so it does not hit a fixture. The model residential code requires at least 21 inches of clear space in front of a toilet, and many designers recommend 30 inches in front for comfort; local codes can differ. Confirm the exact requirement with your building department or designer before finalizing the drawing.

Plan ventilation, electrical and waterproofing

Ventilation is one of the most overlooked parts of a bathroom plan. A properly sized exhaust fan removes moisture that would otherwise damage paint, drywall, framing and finishes. The fan should vent to the outside, not into an attic or a soffit cavity, and it should be sized for the room. Size the fan to the room's floor area, and place it near the shower or tub where the steam is generated.

Electrical work in a bathroom is governed by strict rules because of the water. Most jurisdictions require ground-fault protection for outlets near water sources, and they set specific requirements for fixtures and lighting. Plan the locations of the switch, the outlets, the vanity light and the fan before rough-in, and confirm the requirements with your electrician. Waterproofing behind a shower or tub is equally important. The membrane, the backer board and the slope of the shower floor all work together, and they should be installed to the manufacturer's instructions and the local code.

Choose fixtures and finishes last

Fixtures and finishes come after the layout, the plumbing and the waterproofing plan are set. Choose the toilet, sink, faucet, shower valve and tub based on the rough-in measurements that the plumber has confirmed. Many faucets and valves require specific mounting depths, so buying a fixture before the rough-in is done can lead to returns and delays.

Tile, vanities and lighting are where the look of the room comes together. Pick finishes that suit the use. Smaller tiles and textured floors improve slip resistance, while large sheets of tile reduce the number of grout lines. Choose a vanity size that gives you storage and counter space without crowding the door.

Sequence the work and choose a contractor

Ask your contractor for a written schedule that shows the order of demolition, rough-in, inspection, waterproofing, tile, fixtures and final inspection. Bathroom remodels often involve several trades, so the sequence matters. A plumber or electrician who arrives late can delay tile setting, and a shower pan installed before the rough-in inspection can cause problems. Confirm which permits the project needs and who will pull them.

Before signing a contract, ask each contractor to explain how they will protect the rest of the house, how they will handle a water shutoff and how they will manage waterproofing. The answers show how carefully they plan.

Before the first wall opens

Write down the users, the daily routine, the budget and the layout goals, then ask a designer or contractor to measure the room and mark the plumbing and electrical locations. Use the list of must-haves to compare two or three layouts before you choose fixtures. Be sure to confirm the plumbing and ventilation plan in writing, because those two items are the hardest to change once the walls are closed.